Ausmentum Get involved

A concept for Australia · Open for independent testing

Australia is building AI data centres anyway. Let's build them where they fix waste, water and power.

Ausmentum is a concept for a national network of Closed Loop hubs. Each hub takes in a region's waste and turns every output into an input for something else: power, cooling, clean water, fuel, fertiliser and building materials. An AI data centre at the centre of each hub is the customer that pays for it.

The problem

Five problems that are really one

AI data centres

Australia is pushing to build more AI data centres. Each one needs huge amounts of reliable power and cooling.

Power

Power is already expensive, and every new data centre adds demand to grids that are stretched on hot days.

Water

Many data centres cool with water. Australia is the driest inhabited continent, and towns already compete for supply.

Waste

Millions of tonnes of waste are still buried every year, where they leak gas and polluted water for decades.

Housing

Australia is short of homes, and building them keeps getting more expensive.

Treated separately, each one looks unsolvable. Linked together, one problem's leftovers become another problem's inputs.

One hub

Follow it one stream at a time

The full hub has more than fifty parts. Pick a stream and step through it, or open the whole hub and click any box to see where it comes from and who uses it next.

Drawing the hub…

Waste coming in Process In-between stream Product going out Hot water Warm water Chilled water Electricity

Closed Loop

Nothing leaves unused. Not even the ash.

The last thing left in most waste plants is ash, and it usually goes to landfill. In a Closed Loop hub, the ash is mixed into building material: bricks, road base, and the concrete foundations of new homes.

This is one of the more grounded parts of the concept. Ash has been used in Australian concrete for decades, and geopolymer concrete, which replaces most of the cement with ash-based material, has already been laid at airport scale at Toowoomba's Wellcamp airport.

The goal: every tonne that comes in ends up helping the country, right down to the ground the houses stand on.

The network

Power stays home. The work travels.

One hub makes sense on its own. About thirty of them, linked by fibre, make something bigger. AI work can move between hubs in milliseconds. Electricity never has to: each hub's power stays in its own local grid.

On a hot evening, when a city's grid is under strain, its hubs hand their AI work to hubs in other states and put their own power into the local grid. Perth and Darwin, hours behind the east coast, keep computing while Melbourne and Sydney step back.

6:00 pm
Computing as normal Stepping back, power to local grid Taking extra work

Hub locations and counts are illustrative. The grid peak is modelled as 5–8 pm local time on a hot summer day.

Honest status

What's proven, what's being piloted, what's vision

Most of the hub is built from technology that already works somewhere. What's new is putting it all together, on one site, as one system.

ProvenRunning at scale today

  • Sorting mixed waste into clean material streams
  • Bio-digesters making biogas and fertiliser
  • Capturing gas from old landfill sites
  • Recycling and smelting scrap metal
  • Absorption chillers that make cooling from waste heat
  • Ash used in concrete

PilotReal projects, still early

  • Data centre waste heat reused for farms and greenhouses
  • Membrane distillation of brine into clean water
  • Pyrolysis of mixed waste into power, oils and ash
  • Sodium (salt) batteries
  • 3D-printed houses
  • Algae farms for fuel and fertiliser

VisionNot yet done at scale

  • All of these working together on one site
  • Printing houses from waste-derived material
  • Recovering rare earths from mixed waste
  • A national network of about thirty linked hubs

These ratings are our own starting point. Checking them is the first job for independent researchers.

The path

From idea to thirty hubs

  1. 1

    Feasibility

    Independent researchers check the science and run the numbers: how much waste goes in, how much power, water and product come out, and what is left over.

    Now: looking for research partners
  2. 2

    Pilot

    Test the riskiest links at small scale, starting with the heat cascade from furnace to data centre cooling.

  3. 3

    First hub

    One full-scale hub in a region with the waste, the grid connection and the need. Dandenong South in Victoria is the working example.

  4. 4

    National rollout

    One proven design, built again and again. Long-life infrastructure with steady income, the kind Australian super funds already invest in.

Get involved

Help test this idea

We're looking for researchers, engineers, councils and agencies willing to look hard at whether this works. Criticism is as welcome as support. A clear "this part won't work, and here's why" moves the idea forward too.